After-sales Service: | Engineer Installs, Debugs and Video Instruction |
---|---|
Warranty: | 3 Years |
Condition: | New |
Certification: | ISO 9001:2008, GB/T19001-2008 |
Automation: | Automatic |
Suitable for: | Recycled Material, Paper |
Customization: |
---|
Suppliers with verified business licenses
The corrugated cardboard production line is essential production equipment for corrugated box producers and plays an important role in the creation of corrugated boxes with three, five, or seven layers. Foreign clients, on the other hand, commonly refer to them as three-layer, five-layer, or seven-layer corrugated boxes, depending on the number of fluted sheets.
The mill roll stand, single-roller pre-heater, single facer, overbridge conveyor, multi-roller pre-heater, glue machine, double facer, slitting machine, NC cutoff, stacking machine, glue kitchen, and optional auto splicer, coating machine, production & management system, condensate water recycling system, and waste baler comprise the corrugated production line.
1, Stacker | 2, Cut Off | 3, Slitting Machine |
4, Double Facer | 5, Pasting Machine | 6, Dual-roller preheader |
7, Mill Roll Stand | 8, Overbridge | 9, Preheater |
1, Stacker | 2, Cut Off | 3, Slitting Machine | 4, Double Facer | 5, Pasting Machine |
6, Dual-roller preheader | 7, Mill Roll Stand | 8, Splicer | 9, Single Facer | 10, Preheater |
1, Dual-layer Stacker | 2, Dual-layer Cut Off | 3, Slitting Machine |
4, Cutting Machine | 5, Double Facer | 6, Pasting Machine |
7, Dual-roller preheader | 8, Splicer | 9, Mill Roll Stand |
10, Preheater | 11, Single Facer | 12, Overbridge |
Layer 3, 5, 7, 3+2, 5+2, 7+2 |
Work Width (mm) 1200 - 2800 |
Design Speed (m/min) 80, 100, 150, 200, 220, 250, 300 |
Flute A, C, BC, B, E, F, G, N |
Flute(UV) | Flute Height(mm) | Flute Qty./ 300mm |
A | 4.6-4.9 | 34 ± 2 |
C | 3.6-3.9 | 38 ± 2 or 40 ± 2 |
BC | 3.0-3.4 | 44 ± 2 |
B | 2.6-2.9 | 50 ± 2 |
E | 1.1-1.5 | 92 ± 2 |
1.5-1.8 | 88 ± 2 | |
F | 0.7-0.9 | 124 ± 4 |
G | 0.5-0.65 | 166 ± 6 |
N | 0.4-0.46 | 188 ± 10 |
1. Are you manufacturer or trading company?
We are a combination of manufacturer and trading company.
2. What is the payment term you accept?
We usually accept T/T. DP and LC are also okay for us.
We need 30% payment as deposit to arrange production and the balance should be paid before shipping.
3. What is your leading time on average? How much time is needed for installation?
The manufacturing period for production line is 150 days since the deposit is received and installation period is around 30 days.
4. How do we install and debug machines?
Engineers guide the installation and debug machine via video or on site.
5. Where is the factory? How can we visit there?
The factory is at Mianfang Road 36, Dongguang County, Cangzhou City, Hebei Province, China.
It is near Beijing and Tianjin, so after you get to Beijing or Tianjin airport, we will pick you up and take you to the factory.
Suppliers with verified business licenses